Sourcing notes for custom parts

Drawings, tooling, quality and landed cost, from the team that runs the programmes.

All guides, page 5

Browse the full library.

All engineering tools →
Sourcing9 min read

Volume breaks and MOQ economics

A lower unit price at a higher quantity is not automatically a better deal. Setup, tooling, inventory and the supplier's minimum order quantity decide where the saving stops.

Read
Sourcing9 min read

HS code 3926 for plastic articles

Heading 3926 covers other articles of plastics. For a moulded housing, the first question is whether it is a general article or a part of an electrical apparatus.

Read
Sourcing9 min read

LCL vs FCL: cost and damage risk

Where the shared container stops being cheaper, what the extra handling does to a pallet of parts, and how to test the break even properly.

Read
Sourcing9 min read

Supply continuity planning

How to map single points of failure, choose between a second site and buffer stock, and set triggers that turn a plan into action.

Read

Go from reading to checking

The guides are built around the same questions as the free tools. Size a busbar, check an ISO 2768 callout, build a first article report or compare landed cost.

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.