First article inspection: what a good FAI report contains
The dimensions, material evidence, functional tests and review steps that turn a first sample into an approved production part.
Topic hub
Quality is a set of decisions made before the first part is measured. These guides cover general tolerances, GD&T, first article inspection, PPAP and the records a buyer should expect with a production shipment.
The dimensions, material evidence, functional tests and review steps that turn a first sample into an approved production part.
A release gate for drawing revisions, so a changed note, tolerance or finish is checked against the tool, the gauge and the test before the next order runs.
How to read a fit, choose a basis and avoid the temperature, coating and geometry effects that turn a drawing into a press or a rattle.
How to read a certificate, what the heat number connects and where the evidence stops.
A four-wire measurement is only as good as the current, the probe placement and the joint preparation behind it. Here is how to make the number repeatable.
A standard tensile test assumes a standard specimen. Small stamped, formed and turned parts need a different setup before the curve means anything.
What a coordinate measuring machine does well, what it costs in programming and time, and which characteristics are better checked another way.
Rockwell, Vickers and Brinell measure different things at different scales. How to pick a method, write a callout and read a certificate without converting your way into trouble.
A method for choosing the few characteristics that decide whether a part works, then giving each one a tolerance, a method and an inspection record.
Circular runout, total runout, coaxiality and the legacy concentricity call, and why the choice changes what the inspector can prove.
What a neutral salt spray cabinet measures, how to write the requirement and why the hours are a ranking rather than a service life.
Three controls that are often confused, and the simple question that separates them: is there a datum in the frame?
The Qumek dispatch
Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.