Multi-cavity mould first article checklist
A cavity by cavity sequence for proving a multi-cavity tool, from the run state and the sample plan to the spread across cavities and the records to keep.
Topic hub
Electrical housings carry three jobs at once: structure, insulation and assembly. These guides cover wall sections, ribs, draft, material choice and the tolerances that keep a moulded part fitting.
A cavity by cavity sequence for proving a multi-cavity tool, from the run state and the sample plan to the spread across cavities and the records to keep.
Wall sections, ribs, bosses, draft and material choice for MCB, MCCB and equipment housings that must insulate, locate and assemble.
Tracking and breakdown are different failures with different tests. Here is how to read the numbers and turn them into creepage, clearance and a material call.
GWFI, GWIT and the glow wire test explained: what each one measures, how the results are reported and which requirement belongs on the drawing.
How to pack an assembly so it arrives undamaged, present it at the line without extra handling, and stop packaging from quietly becoming the largest cost per unit.
What a first article inspection and a production part approval pack should contain for a moulded housing, including the plastic-specific evidence that a generic checklist misses.
Three welding methods, three different material and joint rules. The method has to match the material, the access and the joint you can actually design.
Ten rules for parts that go together without a fight, and the assembly cost each one attacks.
What the UL 94 ratings actually measure, how thickness and colour change the result, and how to specify a flame retardant grade without paying for a rating you cannot use.
Why a moulded part measured like a machined part gives the wrong answer, and how to set the condition, the fixture and the datum scheme before the first article.
A rivet is a joint made in one stroke, and a poor joint is often made in the same stroke. Here is how hole, edge, grip and set force decide whether the assembly holds.
How to choose between a screw, a threaded insert, a clinch and a rivet, and the joint details that decide whether the assembly can be opened again.
The Qumek dispatch
Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.