Process fit
The part is checked against the intended process: stamping, forming, machining, coiling, moulding, casting or assembly. The limits of that process, not a generic checklist, drive the note.
A drawing that looks simple can hide a bend, a tolerance or a finish that makes the part expensive or unstable. We review the part as a manufacturer, name what can and cannot be held, and put the cost of holding it on the table before tooling.
At a glance
Most avoidable cost is designed in before a supplier is chosen: a tolerance tighter than the process can hold, a bend too close to a hole, a plating that traps hydrogen, a wall section that cannot fill.
Our design and engineering support is a review of the part against the process that will make it. We do not take over your product design. We tell you which features will decide the price and the yield, and what change would remove the problem.
The part is checked against the intended process: stamping, forming, machining, coiling, moulding, casting or assembly. The limits of that process, not a generic checklist, drive the note.
We identify the dimensions that decide function, the tolerance the process can hold, and the inspection method that will prove it. A tolerance that cannot be measured is not a specification.
The grade, temper, plating and coating are reviewed against the duty: current, spring force, corrosion, solderability or contact resistance. Where a finish creates a risk, we name it.
The features that add cost are identified separately: extra stations, tighter tolerances, secondary operations, special packaging. You see the cost of the requirement, not just the total price.
It starts with the drawing and ends with a decision you can quote against.
We read the drawing with the application in front of us: what the part does, what it mates with, and what happens if it is at the wrong end of tolerance.
Critical features, process limits, material and finish are reviewed. Each risk is tied to a specific dimension or note, not a general comment.
Where a change would remove cost or risk, we show the change and its effect. The decision stays with you.
The drawing is frozen, the inspection method is agreed, and the quotation is built against the part that will actually be made.
Critical dimensions
The question
Which tolerance decides fit or function?
What it changes
Process, gauge and inspection plan
Bend and form
The question
Can the radius, relief and hole distance be held?
What it changes
Tool design and scrap rate
Material
The question
Does the grade and temper suit the duty?
What it changes
Formability, spring force, conductivity
Finish
The question
Does plating or coating create a risk?
What it changes
Hydrogen bake, masking, contact resistance
Assembly
The question
Can the part be located, joined and tested?
What it changes
Fixtures, sequence and poka-yoke
Inspection
The question
Can the drawing be measured as written?
What it changes
Gauge, sampling and record format
The service is used with these products and the tools that support the drawing.
A first review is part of quoting. Where the work needs a formal DFM report, tolerance stack, CAD support or a review meeting, we scope it separately so you know what you are buying.
Yes, for review and quotation. Production still needs a controlled drawing with the critical dimensions, tolerances, material, finish and inspection method. We can help identify what the drawing is missing.
Yes. A mutual NDA is signed before a drawing changes hands. Your drawing is used only for your part and is not shown outside the chain that makes it.
Where the engagement needs it, support is available before the drawing is final. The scope is agreed in writing. We are not a design house and do not take over the product design.
We say so before quoting. The note names the feature, the process limit and the options: change the drawing, add an operation, accept a different yield, or choose another process.
Email us at contact@qumek.com. We respond within 12 hrs.
Your enquiries are confidential with us and we proceed with manufacturing only after signing a NDA.