Quality and inspection

Thermal cycling and humidity testing

Temperature and moisture find the joints, seals and interfaces that a room-temperature check cannot. The value is in the profile, the inspection and the acceptance rule, not the chamber alone.

QKQumek Quality Desk··9 min read·Updated
A⌖ 0.05

Key takeaways

  • Thermal cycling tests expansion mismatch and solder or joint fatigue. Humidity testing tests seals, insulation and corrosion.
  • The profile matters more than the chamber: state the temperature limits, dwell, ramp rate and number of cycles.
  • A test is only complete when the post-test inspection and functional check are defined.
  • Condensation during a ramp can cause failures that a steady-state test never reproduces.

What the two tests do

Thermal cycling moves a part between hot and cold extremes. The materials expand and contract at different rates, so joints, bonds, seals and plated interfaces see strain. Over enough cycles, a weak solder joint can crack, a press fit can loosen and a potting compound can separate.

Humidity testing holds a part in moist air, often at a raised temperature. Moisture enters through seals, pores and material interfaces. It can lower insulation resistance, corrode a plated surface or swell a moulded housing.

The tests are often run together, but they answer different questions. A part can pass a thousand thermal cycles and fail a week of damp heat because its seal is porous. A part can pass damp heat and fail thermal cycling because two materials have very different expansion rates.

The thermal cycle profile

A thermal cycle has four parts: a cold extreme, a hot extreme, a dwell at each and a ramp between them. Each one needs a value. The extremes should reflect the service environment, with margin agreed in the specification. The dwell must be long enough for the part to reach the chamber air temperature, which depends on mass and fixture.

The ramp rate is the part most often left out. A fast ramp creates a larger temperature difference across the part, so it drives more strain. A slow ramp is gentler. If the specification does not state a rate, the result is hard to compare with another laboratory.

For illustration, a profile might run from minus 40 to plus 125 degrees Celsius, with a 30 minute dwell and a ramp of 5 degrees per minute for 100 cycles. Those numbers are illustrative only. The correct values come from the product specification, the standard or the customer requirement.

Dwell time is often set from a thermocouple on the part, not from the chamber air. A heavy casting and a thin contact need very different dwells to reach the same internal temperature. If the specification gives a fixed dwell, check that the part actually stabilises within it.

Steady and cyclic humidity

Steady-state damp heat holds a constant temperature and relative humidity, often 85 degrees Celsius and 85 per cent relative humidity, for a defined number of hours. It is a soak test. It is good at finding moisture ingress, insulation weakness and material degradation.

Cyclic damp heat alternates between a humid hot phase and a cooler phase, often with a condensation period. The cycle drives moisture in and out, which is harsher on seals and coatings than a steady soak. It is closer to a real diurnal cycle or a repeated washdown.

The two tests are not interchangeable. A steady soak is easier to run and easier to compare. A cyclic test is better at exposing a breathing seal. State which one you mean, because a supplier may quote the easier one by default.

Choosing the test

The table maps the risk to the test that is most likely to reveal it. It is a starting point for a test plan, not a substitute for the product specification.

Environmental test selection by failure risk
RiskTestTypical evidence
Solder or joint fatigueThermal cyclingContinuity, cross-section, crack inspection
Seal breathingCyclic damp heatIngress check, insulation resistance
Moisture absorptionSteady damp heatWeight change, insulation resistance
Plated corrosionDamp heat with salt or sulphurVisual, contact resistance
Housing movementThermal shockDimension, seal, visual
Long-term driftTemperature and humidity soakFunction at interval checks

The standard and the customer specification decide the exact profile. Record the chamber, the fixture and the calibration.

What fails, and where

Thermal cycling failures usually start at an interface. A solder joint between materials with different expansion rates accumulates strain. A bonded insert can debond. A crimped joint can relax. A plated through-hole can crack at the barrel.

Humidity failures usually start at a seal or a surface. Moisture crosses a gasket, a potting boundary or a porous coating. Corrosion appears at a cut edge or a scratch. Insulation resistance falls before any visible damage appears.

That is why the inspection must look at the interfaces, not just the outside. A visual check of a sealed unit can pass while the inside is wet. A continuity check can pass while a joint is almost cracked. The test plan should name the checks that reveal the expected failure mode.

Damage often starts before the final check can see it. A seal may weep slightly for many cycles before insulation resistance falls. A joint may develop a hairline crack before resistance changes. Interval checks during the test can show the progression, which is more useful than a single pass or fail at the end.

Acceptance criteria and post-test checks

Acceptance should be written before the test starts. It might be no visible corrosion, insulation resistance above a stated value, contact resistance within a stated change, or no crack in a cross-section. A pass or fail decided after the parts come out is not a test.

Post-test inspection should include a functional check at the specified load or voltage, a dimensional check where thermal expansion matters, and a visual check for cracks, discolouration, seal damage and corrosion. For critical joints, add a cross-section or a dye penetrant check.

Record the chamber identity, the calibration date, the profile actually run and any interruption. A power cut or a door opening can change the result. The report should show the measured profile, not just the set point.

Samples, fixtures and sequencing

The sample size should reflect the risk and the cost. A small pre-production batch may be enough to find a design fault. A qualification programme needs enough units to cover the production spread and the critical interfaces.

The fixture matters. A part clamped to a heavy block heats and cools more slowly than a free part. A part that is powered during the test adds its own heat. State how the part is mounted, whether it is powered and what load it carries.

Sequence the tests to reflect the real life. A product may see thermal cycling, then humidity, then vibration. Running the sequence in the wrong order can hide an interaction or create one that never happens in service.

Keep a control sample at room conditions. If both the tested and the control units fail, the cause may be the build rather than the environment. If only the tested units fail, the profile is doing its job. The control is cheap and often forgotten.

Reading the result

A pass is not proof that the design is immune to the environment. It is evidence that the tested units survived the stated profile. The report should say what was tested, how many units, under which profile and with which checks.

A fail is more useful than a pass if the failure is analysed. Look at where the crack started, which interface absorbed the strain and whether the failure is consistent across samples. That tells you whether the fix belongs in the design, the process or the material.

Keep the failed parts. A cross-section of a failed joint is often the most valuable record in the whole programme, because it shows the mechanism rather than the symptom.

Compare the result with the design intent. If the part was expected to survive a certain number of cycles and failed earlier, the gap is the useful finding. Record it, and use it to set the next test rather than treating the report as a pass or fail only.

Frequently asked questions

What is the difference between thermal cycling and thermal shock?

Both move a part between temperature extremes. Thermal shock uses a rapid transfer, often between baths, which creates a steep gradient. Thermal cycling uses a controlled ramp and dwell, which is closer to many service conditions.

How many thermal cycles are enough?

The number comes from the product specification, the expected service life and the standard being applied. There is no universal number. The profile, dwell and ramp rate matter as much as the count.

Is 85/85 the same as cyclic damp heat?

No. 85 degrees Celsius and 85 per cent relative humidity is usually a steady-state soak. Cyclic damp heat alternates between humid hot and cooler phases, often with condensation, which is harsher on seals.

What should be checked after humidity testing?

At minimum, insulation resistance, a functional check and a visual inspection for corrosion and seal damage. For critical parts, add a weight change, a cross-section or an ingress check.

Sources and further reading

  • IEC 60068-2-14, Environmental testing, test N: change of temperature
  • IEC 60068-2-78, Environmental testing, damp heat, steady state
  • IEC 60068-2-30, Environmental testing, damp heat, cyclic
QK

Qumek Quality Desk

Quality team

The quality team responsible for first article inspection, PPAP packs, supplier audits and the records shipped with production parts.

Planning an environmental test?

Send the part, the service environment and the acceptance requirement. The quality desk will help set the profile and the post-test checks.

Discuss a test plan
Quality9 min read

Vibration and shock testing

Sine, random and shock profiles answer different questions. Pick the one that matches the service load, then fix the mounting and the acceptance check before the first run.

Read

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.