Busbar testing: millivolt drop, pull test and thermal cycling

Four tests answer four different questions. Running one and calling it a qualification is how a joint passes the bench and fails the panel.

QKQumek Engineering Desk··9 min read·Updated
t 10Ø 13.0

Key takeaways

  • A millivolt drop test measures the electrical quality of a joint, not its mechanical strength.
  • A pull or shear test proves a welded joint or a welded stud; a bolted joint needs a torque and contact resistance check instead.
  • Thermal cycling is the test that shows whether a joint stays tight after the service temperature has moved.
  • Every test needs a stated sample, current, duration and acceptance limit, or the result cannot be compared.

Why test a busbar at all

A busbar is a simple part until it is installed. Then it becomes a current path with joints, supports, insulation and a fault duty. A dimensional check confirms the shape, and a material certificate confirms the grade, but neither tells you whether a joint will run hot at the rated current or whether a welded tab will hold under vibration.

Testing is how the design assumptions become evidence. The useful tests are not complicated: a millivolt drop across a joint, a pull or shear test on a welded connection, a thermal cycle that repeats the service temperature, and an insulation test on a coated or isolated bar. Each one answers a question that the others cannot.

Millivolt drop

The millivolt drop test passes a known current through the joint and measures the voltage across it. The probes are placed at a fixed distance either side of the joint, and the result is compared with the voltage across an equal length of solid bar at the same current, or with a limit in the specification. A four-wire meter removes the resistance of the leads from the reading.

The test is sensitive to the things that matter: contact area, surface films, plating, pressure and contamination. It is also sensitive to the way it is performed. Probe spacing, probe pressure, surface condition and current all change the result. A reading taken across a painted face, or with the probes too close to the bolt, is not a joint measurement.

Use the test at first article, on a sample from each lot and after any change to the joint preparation or plating. Keep the current and the probe spacing with the result. A millivolt drop figure without those two numbers cannot be compared with anything.

Pull and shear tests

A pull test applies a tensile load to a welded joint, a welded stud or a terminal, and checks that the connection holds. A shear test loads the joint in the plane of the connection. Both are destructive, so they are run on samples or on sacrificial parts, not on the shipment.

For a welded busbar joint, the test is usually a peel, a shear or a bend, depending on the joint geometry. The result should be recorded as a load and a failure mode. A joint that holds a high load but pulls out of the bar, rather than failing in the weld, is telling you something different from a weld that fails in the nugget.

A bolted joint is not qualified by a pull test in the same way. Its strength comes from the clamp force and the friction between the faces, and the useful checks are torque, fastener proof load and contact resistance. If a pull test is specified for a bolted terminal, it is usually a check on the terminal or the stud, not on the electrical joint.

Record how it failed, not only when

A failure load without a failure mode is hard to act on. Note whether the weld, the parent metal, the stud or the fixing failed.

Thermal cycling

Thermal cycling takes the assembly through the temperature range it will see in service, usually from ambient to the rated operating temperature, and back. The purpose is to expose the change that a single room-temperature test cannot: the joint loosens, the plating creeps, the coating cracks or the contact resistance drifts.

A useful cycle test measures the joint resistance and the fastener torque before and after the cycles, and checks the insulation if the bar is coated. The number of cycles, the temperature limits and the dwell time should come from the specification or the applicable standard. A test with an undefined cycle is a demonstration, not a qualification.

Thermal cycling is also the best check for a coating boundary and a masked joint face. The coating and the metal expand at different rates, and the boundary is where a crack starts. A visual check after the cycles, plus an insulation resistance measurement, will show whether the coating survived.

What each busbar test proves
TestTypical sampleWhat it provesWhat it does not prove
Millivolt dropProduction joint or first articleElectrical quality of the contactMechanical strength or long-term drift
Pull or shearWelded joint or studStrength of the welded connectionContact resistance of a bolted joint
Thermal cyclingRepresentative assemblyStability of resistance and torqueFault current withstand
Insulation resistanceCoated or isolated barIntegrity of the insulation pathMechanical damage under fault force

A qualification programme usually combines these tests. One test on its own leaves at least one failure mode uncovered.

Insulation tests

A coated or isolated busbar needs an insulation test as well as a current path test. The usual checks are insulation resistance and a dielectric withstand test at a stated voltage and duration. The test voltage depends on the system voltage, the standard and the pollution degree, and it should be stated on the drawing or the test schedule.

The test is only meaningful if the bar is clean and dry and the test points are defined. A test from the bar to a metal block is not the same as a test from the bar to the enclosure with the supports fitted. For a production routine, a simple go or no-go test at a defined point is often enough.

A coating pinhole may pass a low-voltage continuity check and fail a dielectric test, or the reverse, depending on the voltage and the moisture. That is why the test method and the acceptance limit belong together, and why a visual check at bends and edges is still part of the routine.

Sampling and sequence

The sequence matters. A destructive test should not be run on the same parts that are used for the electrical test unless the test plan says so. A thermal cycle should come before the final resistance measurement, because the cycle is what changes the joint. An insulation test should come after the mechanical and thermal tests, because those are the tests that can damage the coating.

Sampling should reflect the risk and the production volume. A new joint design, a new plating line or a new welding procedure needs a qualification sample before production. A stable process can move to a periodic sample, provided the periodic test is the same test with the same acceptance limit. Reducing the sample size is a decision, not a drift.

Write the plan as a table with the test, the sample, the sequence, the current or voltage, the duration and the acceptance limit. That table is the difference between a test report and a set of readings.

  1. 01

    Define the duty

    State the rated current, the fault current and duration, the temperature range and the insulation requirement.

  2. 02

    Qualify the design

    Run the full set on representative samples: drop, strength, cycling and insulation.

  3. 03

    Set the routine

    Choose the production checks and the sample frequency, with the same limits as the qualification.

  4. 04

    Record the conditions

    Keep the current, voltage, temperature, probe spacing and sample identity with every result.

  5. 05

    Act on the result

    Contain the lot, find the process cause and re-qualify after a change, rather than retesting until it passes.

Acceptance criteria and records

An acceptance criterion should be a number with a condition. A joint drop of a stated value at a stated current and probe spacing is a criterion. A note that says the joint should be tight is not. The same applies to a pull test: a load and a failure mode, not a pass stamp.

The records should identify the sample, the drawing revision, the material and plating lots, the test equipment and the operator. If the test is destructive, record the failure location and keep a photograph if the programme allows it. If the test is non-destructive, record the reading and the point where it was taken.

Frequently asked questions

What current is used for a busbar millivolt drop test?

Use a current high enough to give a readable voltage and representative of the service current, and state it with the result. Some specifications use the rated current, others use a lower test current and compare with an equal length of bar. The important point is that the current and the probe spacing are fixed and recorded.

Is a pull test required for every busbar joint?

No. A pull or shear test is used for welded joints and studs, where strength is the question. A bolted joint is checked by torque and contact resistance. The test plan should match the joint method and the failure mode that matters.

How many thermal cycles does a busbar need?

The number depends on the specification, the duty cycle and the standard. It should be stated with the temperature limits and the dwell time. A cycle test with no defined range or count cannot be compared between suppliers or between lots.

Can a millivolt drop test find a loose bolted joint?

It can find the effect of a loose joint if the contact resistance has risen enough. It will not tell you the bolt torque. Use both checks: torque for the fastener and millivolt drop for the electrical path. A joint can be tight and contaminated, or loose and still conducting for a while.

Sources and further reading

  • IEC 61439-1, Low-voltage switchgear and controlgear assemblies
  • IEC 60947-1, Low-voltage switchgear and controlgear, general rules
  • Qumek busbar test plans and joint qualification reviews
QK

Qumek Engineering Desk

Engineering team

The engineering team behind Qumek drawings, DFM notes, tolerances and inspection standards. Every guide is reviewed against the drawings and processes used on live programmes.

Writing a busbar test plan?

Send the joint method, current, fault level and insulation requirement. The engineering desk will propose the tests, samples and acceptance limits before quoting.

Send the test requirement

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.