Sourcing notes for custom parts

Drawings, tooling, quality and landed cost, from the team that runs the programmes.

All guides, page 7

Browse the full library.

All engineering tools →
Sourcing10 min read

India vs China for engineered parts

A buyer's comparison of capability, cost, tooling, documentation and trade exposure, written for parts that must be right rather than merely cheap.

Read
Sourcing9 min read

Currency exposure and quotation validity

A price is only valid on the assumptions behind it. Currency, metal and freight can move before the purchase order is placed, and the contract decides who absorbs the difference.

Read
Sourcing10 min read

Import duty vs GST vs anti-dumping duty

Three charges appear on an import entry for different reasons. Mixing them up overstates cost, understates cash flow and hides the one charge you may not recover.

Read

Go from reading to checking

The guides are built around the same questions as the free tools. Size a busbar, check an ISO 2768 callout, build a first article report or compare landed cost.

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.