Sourcing notes for custom parts

Drawings, tooling, quality and landed cost, from the team that runs the programmes.

All guides, page 24

Browse the full library.

All engineering tools →
Quality9 min read

In-process inspection vs final inspection

Both catch defects, but one catches them while the part can still be corrected. The choice is about where a defect becomes expensive, not about which check is more thorough.

Read
Lugs9 min read

Busbar-to-cable transition design

Where a busbar meets a cable, the joint decides the current path, the strain and the inspection. Four routes and the calls that keep them reliable.

Read
Lugs9 min read

Cable lugs for transformers and UPS

Duty current is only the start. Fault withstand, terminal pads, clamp force and clearance decide the lug on a transformer or UPS connection.

Read
Lugs9 min read

Connector housing materials and flammability

UL 94, glow wire, CTI and temperature index answer four different questions. A housing that passes one can still fail the others, so the specification has to ask for all four.

Read

Go from reading to checking

The guides are built around the same questions as the free tools. Size a busbar, check an ISO 2768 callout, build a first article report or compare landed cost.

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.