AS9102 FAI vs PPAP: two approval routes compared
Both approvals happen before volume, but they answer different questions. Here is how the aerospace first article and the automotive production approval differ.
Topic hub
Quality is a set of decisions made before the first part is measured. These guides cover general tolerances, GD&T, first article inspection, PPAP and the records a buyer should expect with a production shipment.
Both approvals happen before volume, but they answer different questions. Here is how the aerospace first article and the automotive production approval differ.
How much the class actually changes, where fine tolerances earn their cost, and why medium is the better default for most custom parts.
Two tests that look alike on a report and answer different questions. How to set the load axis, choose the sample and record a result that survives an audit.
Two regimes, three common declaration types and the checks that show whether a document describes the part that will actually ship.
What ISO 2768 covers, how to choose f, m, c or v, and where the standard stops and the drawing has to take over.
A conductivity number is meaningless without the method, the temperature and the direction of measurement. Here is how to read the result and when to ask for a test.
Sine, random and shock profiles answer different questions. Pick the one that matches the service load, then fix the mounting and the acceptance check before the first run.
Temperature and moisture find the joints, seals and interfaces that a room-temperature check cannot. The value is in the profile, the inspection and the acceptance rule, not the chamber alone.
A unique device identifier is a label, a database entry and a change control record at the same time. Here is what a component supplier needs to hold, print and prove.
Sometimes a known non-conformance has to ship. A controlled concession records the risk, the approver and the limit, so a one-off decision does not become a silent change.
CAPA fails when it stops at the apology. The work is containment, cause, a change to the system and evidence that the failure has not returned.
Both catch defects, but one catches them while the part can still be corrected. The choice is about where a defect becomes expensive, not about which check is more thorough.
The Qumek dispatch
Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.