Aluminium heat sinks for solar and storage

Qumek builds heat sinks for programmes in solar and storage, where DC current, outdoor corrosion and thermal cycling. The work starts with the application and the drawing, then moves through DFM, material and finish selection, first article and production.

1DFM review
2First article
3Production
4Export pack

What solar and storage need from heat sinks

The application sets the requirement: DC current, outdoor corrosion and thermal cycling. A part that works on a bench can fail in service if the thermal cycle, vibration, cleaning or fault current is not in the drawing review.

Typical parts in this category include inverters, EV chargers, data centres and LED lighting. We review the mating part and the assembly context, not only the standalone drawing.

Design and process fit

The main processes are extrusion, machining, skiving, bonding and anodising. The process choice follows the geometry, the volume and the tolerance. A prototype may use a different route from production, but the drawing should be designed for the final process.

Materials include 6063 and 6061 aluminium, with copper for high-density duties. The grade, temper and finish must match the duty. For solar and storage, the design review should also cover creepage, clearances, thermal paths and service access where they apply.

Quality and test evidence

Inspection covers profile, flatness, fin geometry and thermal resistance. Depending on the programme, the evidence can include insulation, thermal cycling and salt spray. The first article should show the characteristics that matter to the assembly, not every dimension at the same weight.

Standards that may apply include IEC 62109 where applicable. The exact scope depends on the final product and the market, so confirm it with the importer and the assembly standard.

Materials and finishes

Finishes include clear or black anodising and chromate conversion coating. The finish is part of the function: it can change contact resistance, corrosion life, solderability or the ability to dissipate heat.

State the finish standard, thickness and any bare or masked zones. If the part is plated after forming, check that the coating survives the bend or crimp.

Supplier and programme fit

A programme for solar and storage needs more than a part price. It needs a supplier that can hold the drawing revision, control change, keep traceability and release the inspection pack with the shipment.

We can support prototype, pilot and production stages, with first article, PPAP or a delta FAI where the programme requires it. Tool ownership and change control should be agreed before the first order.

What to send

Send the drawing, the application, the annual volume, the release size, the material, the finish, the test requirement and the destination. Add the assembly drawing and the applicable standard if they exist.

A short application note is often more useful than a longer drawing pack. It tells the supplier which features are functional and which are only geometric.

What to specify for heat sinks in solar and storage
RequirementWhat to sendWhy it matters
ApplicationDC current, outdoor corrosion and thermal cyclingSets the real duty, not just the drawing
Material6063 and 6061 aluminium, with copper for high-density dutiesStrength, conductivity, fatigue and finish
Testinsulation, thermal cycling and salt sprayProves the part in the intended duty
StandardIEC 62109 where applicableDefines the evidence and release route

Questions buyers ask

Can Qumek make heat sinks for solar and storage?

Yes, where the drawing, material and inspection requirements fit the process. We review the application and the assembly context before quoting.

Which tests should we specify?

Start with insulation, thermal cycling and salt spray. Add any test that the final product standard or the customer requires. The first article should show the test method and the result.

Can you support a prototype and then production?

Yes. The prototype route may use different tooling from production, but the drawing and the critical characteristics should stay the same. A delta FAI or PPAP can bridge the change.

What should the RFQ include?

The drawing, application, volume, material, finish, test requirement, destination and any standard or declaration. The more of that you provide, the fewer assumptions sit in the quote.

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.