Plastic moulding RFQ checklist: what to send and why

The part data, material calls, tool decisions and volume figures that turn a vague moulding enquiry into a quote you can compare.

QKQumek Engineering Desk··9 min read·Updated
2.5 wall1° draft

Key takeaways

  • A quote is only comparable when the RFQ fixes the material, the tool plan and the inspection level.
  • State the flame rating together with the wall thickness at which it applies.
  • Cavity count follows the annual volume and the tool budget, not the habit of the supplier.
  • Ask every supplier for the list of assumptions behind the price.

Why a moulding quote comes back vague

A moulding quote is only as specific as the enquiry behind it. When a buyer sends a 3D model and a target price, the moulder fills the gaps with assumptions: one cavity, a standard grade, a general tolerance, a packing method chosen for convenience. The number that comes back can look competitive because it describes a slightly different part from the one the buyer has in mind.

A structured RFQ closes that gap without turning into a tender document. It only has to answer the questions that move the price: what the part must do, which dimensions locate it, which material and rating apply, how many cavities the volume justifies, who owns the tool, and how the parts will be packed and inspected.

The checklist below follows the order a moulder uses to build a price. Send the items in that order and the quote arrives in a form you can compare line by line rather than a single number that hides six decisions.

Part data: the model, the drawing and the critical few

Send a STEP file and a 2D drawing. The model gives the geometry; the drawing gives the tolerance, the datum scheme and the surfaces that matter. A model on its own pushes every tolerance decision to the supplier, and the supplier will choose values that suit the tool rather than the assembly.

Mark the critical dimensions instead of tolerancing everything. A housing usually has four or five features that decide whether it assembles: terminal pocket position, cover interface flatness, mounting hole position, a breaker slot width and a sealing face. Tighten those and leave the rest to a general tolerance such as ISO 2768-m or a moulding tolerance standard.

State the cosmetic requirement in words the toolmaker can act on. A visible face with a texture, a class A surface, a laser marking area and a gate position that must not be seen are all tool decisions. Raised after the mould is cut, each one costs steel and time.

  • Current revision of the 3D model in STEP or Parasolid
  • 2D drawing with datums, critical dimensions and a general tolerance
  • Cosmetic surfaces, texture grade and gate restrictions
  • Assembly drawing if the part mates with other components
  • Any feature the supplier must not change without approval

Material and compliance

Material is the second largest line in most quotes and the easiest to leave vague. A grade name alone is not enough. Two PA66 grades with the same name can carry different flame ratings, different tracking indices and different impact behaviour at low temperature, and the price follows the additive package.

State the rating with the thickness at which it applies. A UL 94 V-0 result at 1.5 mm does not transfer to a 0.8 mm wall. If the housing must meet a glow wire test or a tracking requirement, name the standard and the severity, because a grade that passes one may fail the other. Colour belongs in the same paragraph, since a masterbatch change can move a flame result.

Material calls that change a moulding price
What to stateWhy it moves the priceWhat good looks like
Polymer and gradeAdditive packages and fillers carry a premiumGrade name, supplier and data sheet revision
Flame rating and thicknessA rating at a thinner wall needs a different gradeStandard, class, thickness and colour tested
Tracking indexHigher tracking grades cost more and steer creepageCTI value and the standard it was measured to
Continuous use temperatureHeat stabilised grades cost more than standard onesTemperature and the hours behind the figure
Colour and masterbatchSpecial colours have minimum order quantitiesColour reference, finish and marking requirement
Filler or reinforcementGlass changes shrink, wear and weld line strengthPercentage and type, if the drawing calls for it

Ask for the data sheet at the wall thickness used, not the headline sheet for the grade.

The tool: cavities, steel and ownership

The tool plan is where two quotes for the same part diverge most. A single cavity tool in a standard steel and a four cavity tool with two side actions are different products, and the piece price reflects that. Put the expectation in the RFQ so the supplier prices the same thing.

  1. 01

    Cavity count

    Match cavities to annual volume and tool budget. One cavity keeps the tool cheap and the cycle cost per part high; four cavities spread the cycle but need a larger press and a longer tool build.

  2. 02

    Steel and life

    Name the steel family and the expected tool life. A soft steel for a pilot is a valid choice; the same steel for a ten year programme is not.

  3. 03

    Gating and ejection

    Ask where the gate lands and how the part ejects. Gate position sets weld line position, and weld lines decide where a housing may crack.

  4. 04

    Side actions

    Every side action adds tool cost, maintenance and cycle time. List the undercuts and ask which the supplier would remove for the same function.

  5. 05

    Ownership

    State who owns the tool, who pays for maintenance and how the tool moves if the supplier changes. Agree it in the RFQ, not after a disagreement.

Volume, schedule and forecast

A piece price without a volume is a guess. Give the annual quantity, the monthly call off, the first year ramp and the expected life of the programme. Suppliers price tooling amortisation and machine time against those figures, and a change in any of them changes the answer.

Say how firm the forecast is and how far ahead you will commit. Many moulders will hold a price for a stated volume band and reopen it below that band. That is reasonable, provided the band is written down.

Add the delivery destination and the Incoterm. A price delivered to a warehouse inland is not the same as a price ex works, and the gap is larger for a bulky part than for a dense one.

The cost of proving the tool belongs in the same conversation. A trial, a correction loop and a first article take machine time that the supplier has to recover, either as a separate line or inside the piece price. Ask which, and ask how many trials the price includes.

Lead time follows the same logic. A tool built in eight weeks and a tool built in twelve are different quotes, and rushing the tool usually costs more in correction than it saves in schedule. Put the required first article date in the RFQ and let the supplier build the plan backwards from it.

Finish, assembly and packing

Secondary operations decide whether the part leaves the moulder as a component or as a finished subassembly. Printing, laser marking, insert fitting, ultrasonic welding and leak testing each need a line in the RFQ, with the acceptance check that goes with them.

Packing deserves the same treatment. Give the parts per bag, per carton and per pallet, and say whether the packaging is returnable. For a light, bulky moulding the packing density often decides the landed cost more than the piece price does.

Finally, name the inspection level. A first article against the drawing, a dimensional report per batch and a visual standard for cosmetic parts are three different commitments, and the supplier needs to cost the one you actually want.

Comparing the quotes you get back

Quotes rarely arrive in the same structure. One supplier bundles the tool into the piece price, another lists it separately, a third excludes the first trial. Normalise before comparing: tool cost, piece price at the stated volume, material assumption, packing, freight and payment terms.

Then read the assumption list. The supplier that writes down its assumptions is easier to hold to the price than the one that sends a single figure.

  • Is the tool quoted separately, and is it amortised or paid up front?
  • Which material grade and which data sheet revision sit behind the price?
  • What cavity count and cycle time does the price assume?
  • Which secondary operations and which inspection steps are included?
  • What volume band holds the price, and what happens below it?

Ask for the assumptions, not just the number

A quote with a written assumption list can be compared, challenged and improved. A quote without one can only be accepted or rejected.

Frequently asked questions

What files should I send with a moulding RFQ?

Send the current 3D model in STEP or Parasolid, a 2D drawing with datums and critical dimensions, the assembly drawing if the part mates with others, and the material and finish calls. Add the annual volume, the packing requirement and the inspection level.

How many cavities should the mould have?

Enough to cover the annual volume on a press that is available, and no more. A low volume part often runs best in a single cavity tool. A high volume part justifies a multi cavity tool because the cycle cost per part falls. Ask the supplier to show the press size and cycle time behind each option.

Can I get a quote before the design is frozen?

Yes, and it is often useful. Send the concept, mark which features are fixed and ask for a price range with a DFM note on the features that will move the number. That is more useful than a firm price built on an assumption that later changes.

Should the tool be quoted separately?

Separate is easier to compare and easier to own. If the tool is amortised into the piece price, ask for the amortisation period, the volume it assumes and what happens to the tool if the programme ends early.

Sources and further reading

  • ISO 2768-1:1989, General tolerances, linear and angular dimensions
  • ISO 20457:2018, Plastics moulded parts, tolerances and acceptance conditions
  • UL 94, Standard for safety of flammability of plastic materials
QK

Qumek Engineering Desk

Engineering team

The engineering team behind Qumek drawings, DFM notes, tolerances and inspection standards. Every guide is reviewed against the drawings and processes used on live programmes.

Have a moulding RFQ that needs a second opinion?

Send the model, the drawing and the volume. The engineering desk will reply with a written note on the material calls, the tool plan and the gaps in the enquiry.

Send a drawing
Plastics9 min read

Wall thickness rules for moulded parts

How nominal wall, transitions and rib geometry decide fill pressure, sink marks and cycle time, with practical ranges by material and the checks to run before tooling.

Read

The Qumek dispatch

One useful email a month

Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.

One email a month. No spam, no list sharing.