Assembly FAI and PPAP: the pack for a multi part build
How to run a first article on an assembly, link the BOM to the ballooned drawing, and build a PPAP pack that proves the process, not just the parts.
Drawings, tooling, quality and landed cost, from the team that runs the programmes.
Browse the full library.
How to run a first article on an assembly, link the BOM to the ballooned drawing, and build a PPAP pack that proves the process, not just the parts.
How the gate position sets the fill pattern, where weld lines land, and what each gate type leaves on the part.
Why a joint between aluminium, steel and copper moves and corrodes, and the design details that keep it tight through temperature cycles and a wet service life.
A fill, pack, cool and warp study can find a short shot, a hot spot or a bowed cover before the steel is cut. It can also be run on the wrong inputs and answer a question nobody asked.
How cavity count, steel grade, runner type and side actions move a mould quote, and how to compare tooling on total cost rather than price alone.
A line by line way to build an assembly cost, check a supplier quote and see which input is really moving the unit price.
A test plan for mechanical assemblies: what each test proves, how to set the sample and the acceptance, and how to keep the fixture from inventing failures.
An aluminium or soft steel tool can put parts in customers' hands months before a hardened tool is ready. Here is what it can hold, what it cannot, and how to plan the handover.
Material pairs, bond lines and geometry for soft-touch overmoulds that stay attached, seal reliably and protect a cable at the entry point.
Why an undercut blocks ejection, the four ways to mould one, and how a side action changes tool cost, cycle time, maintenance and the tolerance you can hold.
A line by line model for comparing suppliers on the same basis, with a worked example and the costs most quotes leave out.
How to add up the tolerances in a multi part assembly, when the worst case answer is the honest one, and how to read the result back onto the drawing.
The guides are built around the same questions as the free tools. Size a busbar, check an ISO 2768 callout, build a first article report or compare landed cost.
The Qumek dispatch
Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.