Cpk and Ppk: what buyers should ask for
Two capability indices, two standard deviations and two different questions about whether a process can hold a tolerance.
Drawings, tooling, quality and landed cost, from the team that runs the programmes.
Browse the full library.
Two capability indices, two standard deviations and two different questions about whether a process can hold a tolerance.
Every reading carries a margin. How to build a small uncertainty budget, apply a decision rule and stop arguing about a result that sits on the limit.
One control for form, orientation and location, plus the difference between a surface zone and a line zone and where each one earns its cost.
Most first-run arguments are settled before the spindle turns. Datum, clamping, support and access decide whether the drawing, the setup and the inspection agree.
The studies behind a measurement system, the numbers a gauge R&R produces and how to read them before a tolerance decision.
The fields that make an NCR usable, the containment that protects the customer, and the eight disciplines that stop the same defect returning.
How a position zone is built, when bonus tolerance applies, and why the M modifier is not a licence to ignore the worst case.
Control charts were built for long runs. Here is how to use them on fifty-piece lots without inventing limits or overreacting to noise.
The columns, the three life cycle versions and the reaction plans that turn a control plan from a document into process control.
A practical method for picking datum features that match the assembly, the fixture and the CMM, with the errors that make a good callout unmeasurable.
A goods-in plan built on part criticality and supplier evidence, with the sample, the record and the quarantine step written down.
What belongs in the pack, what each document actually proves and the gaps that turn a first delivery into a hold at goods-in.
The guides are built around the same questions as the free tools. Size a busbar, check an ISO 2768 callout, build a first article report or compare landed cost.
The Qumek dispatch
Drawing notes, supplier checks, tariff changes and the questions buyers keep asking. No newsletter filler, no daily drip.