Key takeaways
- An assembly price is built from a BOM, a routing, a test plan and a pack plan, so all four belong in the RFQ.
- Name approved sources and alternates. A free choice of component can change the fit and the price.
- State who supplies the components and who carries the risk on scrap.
- Ask for the labour time and the test time behind the quote, not only the total.
An assembly RFQ is a BOM plus a process
A part RFQ asks a supplier to make something. An assembly RFQ asks a supplier to buy, receive, inspect, build, test, pack and ship a set of things. The price is mostly labour, test time and logistics, and the material can be a pass through or a risk the supplier carries.
That difference changes what the enquiry needs. A drawing set alone will produce a price for the build step. It will not produce a price for incoming inspection, for the fixture, for the test station, for the rework loop or for the packing that keeps a painted cover from being scuffed on the way to the customer.
The RFQ should describe the whole route. A supplier that has to guess the route will price the guess, and the guess is usually either too optimistic or padded with contingency.
Most of the cost sits in minutes that no drawing shows: walking to a bin, checking a label, testing a unit, repacking a return. The RFQ is the only chance to put those minutes on the table before they are priced by default.
The BOM: structure and approved sources
Send the BOM as a structured file, not a PDF of a spreadsheet. Every line needs a part number, a description, a revision, a quantity per assembly, a unit of measure and a source: free issue, supplier bought, or customer nominated.
Say which lines have an approved source and which have an approved alternate. A supplier that substitutes a latch to save cost can change the feel of the lid and the result of the function test. A supplier that cannot substitute at all may be stuck with a long lead time on a single source component.
Deal with scrap and attrition explicitly. Every assembly line loses components to handling damage, dropped screws and test failures. State the allowance, or state that the supplier carries it, and make sure the piece price reflects the answer.
Long lead components decide the launch date more often than the build does. Ask the supplier to flag the lines with a lead time longer than the build cycle, and decide whether to hold stock, negotiate a buffer or redesign around the part. That conversation belongs in the RFQ, because it changes the price.
Drawings: the assembly view and the interfaces
The assembly drawing should show the build in its finished state, with the interfaces that matter: mounting points, connector positions, label areas, cable routing and the surfaces that must not be marked.
Mark the critical characteristics on the assembly drawing rather than leaving them to the component drawings. The gap between a cover and a housing, the flush condition of a nameplate and the position of a terminal block are assembly results, and the assembler owns them.
Add the torque table, the adhesive callout and the test specification as controlled documents with revision numbers. An assembly instruction that lives in an email is not a controlled document.
- Assembly drawing at the current revision, with the build state shown
- Component drawings that match the BOM revision
- Torque table and adhesive callouts as controlled documents
- Test specification with limits, sample sizes and method
- Label artwork and the barcode standard the customer scans
Test and acceptance
State what every unit must pass before it is packed, and what a sample must pass per batch. A continuity check, a hi pot test, a functional cycle and a visual standard are separate requirements and each has a cost.
Name the equipment expectation. If the test needs a fixture that the supplier must build, say so and ask for it as a separate line. If the buyer supplies the test box, say who maintains it and who calibrates it.
Agree the reaction to a failure. A unit that fails a function test may be reworked, retested or scrapped. The RFQ should say which, and who pays for the time. Without that, the first bad batch becomes a negotiation.
A test that the supplier cannot perform without new equipment is a capital decision, not a labour line. Compare buying the box yourself and shipping it against paying the supplier to buy one, and write down who calibrates it and who owns it if the programme moves.
Packing, kitting and shipping
Packing for an assembly is a design task. A painted housing needs a bag or a foam layer. A long busbar assembly needs a rigid support. A kit with small fasteners needs compartments that survive the journey.
Decide whether the shipment is a finished assembly or a kit for the customer to build. Kitting looks cheaper on paper and often is not, because the kit has to be counted, packed and verified, and a missing screw stops a line.
Give the carton quantity, the label format and the pallet pattern. If the customer scans a label at goods in, the barcode standard belongs in the RFQ, not in a complaint after the first shipment.
Returnable packaging is worth considering where the volume is steady and the distance is short. For an export programme the return leg usually costs more than the carton, so single trip packaging with a known specification is often the better answer.
Volume, schedule and change control
Give the annual volume, the call off pattern and the ramp. Assembly labour scales with volume in steps: a cell that builds 50 units a day needs a different layout from one that builds 500. A supplier quoting the high volume rate for a low volume launch will lose money, and will recover it somewhere.
State the change process. Who approves a component substitution, how much notice a drawing change needs, and who pays for components that become obsolete. Assemblies carry more exposure to change than single parts because a change on one line can strand stock on five.
Ask for price validity and the index, if any, that the price follows. Labour rates and freight move, and a price with no validity clause is a price that will be reopened.
A ramp that starts at a low volume and climbs quickly needs a layout that can absorb the climb. Ask how the supplier would add a second shift and what that does to the piece price, because the answer is often a step change rather than a smooth curve.
Share the forecast horizon you can actually commit to, and ask what the supplier needs to hold a rate. An assembler that can see three months of firm orders will plan labour differently from one working week to week, and the difference shows up in the price and in the overtime.
The checklist
The table below is the short version. Send the items in the order the supplier builds the price, and the quote will arrive with the labour and test time visible rather than buried in a total.
Where an item is missing, mark it as an open assumption instead of leaving the field blank, so the supplier prices the gap openly. A blank field is usually filled with the cheapest assumption, and the cheapest assumption is rarely the one that survives contact with production.
| Item | Why it matters | What good looks like |
|---|---|---|
| Structured BOM | Drives material, lead time and make or buy | Part number, revision, quantity and source per line |
| Approved sources | Controls fit, function and cost | Named source and named alternate per critical line |
| Assembly drawing | Defines the interfaces the assembler owns | Critical characteristics marked, revision controlled |
| Work instruction | Sets the labour time and the method | Torque table, sequence and fixture reference |
| Test specification | Drives equipment, time and scrap | Method, limit, sample and reaction per test |
| Scrap allowance | Decides who carries component loss | Percentage agreed, with the basis written down |
| Pack specification | Protects the finish and sets freight volume | Carton, label, pallet pattern and returnable status |
| Volume and change terms | Sets the labour model and the risk | Annual, call off, ramp and approval route |
Where an item is not available yet, say so and mark it as an assumption for the supplier to price.
Frequently asked questions
What is the difference between a part RFQ and an assembly RFQ?
A part RFQ prices material and conversion for one drawing. An assembly RFQ prices a route: incoming inspection, build labour, test, rework, packing and freight, across a BOM. The assembly quote is mostly time, so the RFQ has to describe the time.
Should I supply the components or let the assembler buy them?
Free issue gives control and can lower the piece price, but it puts the logistics and the scrap risk on the buyer. Supplier purchase is simpler to administer and usually carries a margin. Choose per line, and write the choice into the BOM.
How do I compare assembly quotes from different suppliers?
Ask each supplier to break the price into material, labour time, test time, tooling and packing. Then compare the labour minutes and the test minutes, not just the total. A low total with an unexplained labour rate is a quote that will move.
What test information belongs in the RFQ?
The test method, the acceptance limit, the sample size and frequency, the equipment expectation and the reaction to a failure. If a fixture must be built, ask for it as a separate cost line so it can be compared.
Sources and further reading
- ISO 9001:2015, Quality management systems, requirements
- IPC-A-610, Acceptability of electronic assemblies
- Qumek assembly RFQ templates and supplier cost breakdowns
Qumek Engineering Desk
Engineering team
The engineering team behind Qumek drawings, DFM notes, tolerances and inspection standards. Every guide is reviewed against the drawings and processes used on live programmes.
Have an assembly BOM ready to quote?
Send the BOM, the assembly drawing and the test requirement. The engineering desk will reply with the gaps a supplier would otherwise price as an assumption.
Send a BOM